In 2012, Copenhagen Pump was contacted by the West Incinerator for the construction and construction of mobile dosage sunits for pumping oxygen inhibitors in cross-heat exchangers.
The pressure was relatively high up to 24 bar. They therefore needed to build on a relatively strong approach hose.
The system is built in terms of user safety and is therefore carried out with safety valves and HT hoses.